I. Bayan
90-3 Dual-way Thermostatic Magnetic MixerA ka baara kɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka t A ye tɛ̈n yenë yïn tɛ̈n yenë yïn tɛ̈n yenë yïn tɛ̈n yenë yïn tɛ̈n yenë yïn tɛ̈n yenë yïn tɛ̈n yenë yïn t
II. Karakteristika
90-3 dual-direction thermostatic magnetic mixer ye kä ye kek looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi. Kɔnɔŋ kënë ye luɔɔi de teknoloji ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ 90-2 ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye.
III. Teknik Indikator
(1) Kä ye looi: 0-40°C; A tɛmɛ 85%.
(2) Voltage de luɔi: AC220V ± 10%; 50HZ。
(3) Kɔɔr kɔɔr: 20-3000ml.
(4) Lɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k
(5) Warm temperature: room temperature -150°C (adjustable).
(6) Puɔ̈l ye kɔɔr: 0-350W (lëu bï ya waar).
(7) Wakat: 0-120 minit (ye 90-2 ye).
(8) Volume: 185 × 185 × 140 (mm)
(9) Kɔɔr: 3.8kg
4. Parameters of similar products (Parameters of similar products)
Model |
Nyuɔ |
Parameters teknis |
Kɔɔr (kg) |
Modɛl 90 |
Magnetic Mixer |
Kɔɔrɔ: 20-3000ml Kɔɔrɔ: 0-2400 rpm |
3.6 |
90-1 ye |
Thermostat Magnetic Mixer |
Kɔɔrɔ: 20-3000ml; Kɔɔrɔ: Room temperature -150 ℃ Tɛmɛ: 0-1250 rpm; Kɔɔr: 0-350W |
3.8 |
90-2 ye |
Temperature Magnetic Mixer |
Kɔɔrɔ: 20-3000ml; Kɔɔrɔ: Room temperature -150 ℃ Tɛmɛ: 0-1250 rpm; Kɔɔr: 0-350W Wakat: 0-120 min |
3.5 |
90-3 |
Dual-way thermostatic magnetik mixer |
Lɔ̈ɔ̈i: 20-3000ml (Lɔ̈ɔ̈i në dhɔ̈l yiic) Tɛmɛ: 0-1250 rpm; Kɔɔr: 0-350W Kɔɔr tɛmɛ: tɛmɛ ɣön -150 ℃; Wakat: 0-120 min |
4 |
5. Luɔi
1, ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔ Në kë de kä ye kek tɔ̈ɔ̈u në ɣän kɔ̈k yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yi Ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka
2, ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan Ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛm
3, after mechanical electrical: ka tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ To ye tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈
4, static first and then dynamic: to the device is not powered, judge the electrical device button, transformer, heat relay and the fuse's good or bad, so determine where the failure is. 4, static first and then dynamic: to the device is not powered, judge the electrical device button, transformer, heat relay and the fuse's good or bad, so judge where the failure is. Electricity test, listen to its voice, measure parameters, judge failure, zui after repair. Electricity test, listen to its voice, measure parameters, judge failure, zui after repair. Electricity test, listen to its voice, measure parameters, judge failure, zui after repair. Na ye motor ye tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n
5, fuu nɔgɔya ka tɔ̈u lɔ̈ɔ̈m: ka tɔ̈u lɔ̈ɔ̈m, ka tɔ̈u lɔ̈ɔ̈m, ka tɔ̈u lɔ̈ɔ̈m, ka tɔ̈u lɔ̈ɔ̈m, ka tɔ̈u lɔ̈ɔ̈m, ka tɔ̈u Kä juëc cï röt looi aye bɛ̈n sabab de kä ye kek tɔ̈ɔ̈u ku kä ye kek tɔ̈ɔ̈u.
6, first power after equipment: power part failure rate in the entire failure equipment accounts for a high percentage, so first repair power supply can often do half work times.
7, first failure after debugging: for debugging and failure coexisting electrical equipment, you should first eliminate the failure, then debugging, debugging must be done in the electrical line speed. 7, first failure after debugging: for debugging and failure coexisting electrical equipment, you should first eliminate the failure, then debugging, debugging must be done in the electrical line speed.
8, ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔ Kä ye kek tɛ̈n yenë kek tɛ̈n yenë kek tɛ̈n yenë kek tɛ̈n yenë kek tɛ̈n yenë kek tɛ̈n yenë kek tɛ̈n yenë kek tɛ̈n yenë
Warranty method three packs a year, lifetime maintenance!
Ajuiɛɛr kënë acï ISO9001-2008 Quality System Certification
