Yun TangManufacturers of Atmospheric Monitoring EquipmentShandong Yunze Precision Instrument Co., Ltd., Shandong Bluebow Optoelectronic Technology Co., Ltd., ye kɔc ka diɔ̈ɔ̈r ye kɔc ka diɔ̈ɔ̈r ye kɔc ka diɔ̈ɔ̈r ye kɔc ka diɔ̈ɔ̈r ye kɔc ka diɔ̈ɔ̈rYe.
Yuntang air monitoring equipment manufacturer also has Shandong Yunze Precision Instrument Co., Ltd. and Shandong lanhong Photoelectric Technology Co., Ltd., only three of which belong to Yuntang company system, please know.

Yun TangManufacturers of Atmospheric Monitoring EquipmentThe air quality detector is a grid-based air quality monitoring station based on the Internet of Things, using modular design, to divided sampling head (four gas and two dust (SO2, NO2, CO, O3, PM2.5, PM10)) and temperature and humidity sensors independently installed outside the main box, can be fully automated operating all the day in a non-custodial harsh environment, and to group the network through wireless means, to achieve real-time data monitoring transmission, and to gather to the "Internet of Things big data transmission platform", to provide the data base for grid monitoring.
Teknoloji de Air Quality Tester:
1, ye kë wïc GB/T17626.2-2006 electrostatic discharge resistance standard. A leŋ kë wïc GB/T17626.3-2006 RF electromagnetic field radiation resistance standard. A leŋ GB/T17626.4-2008 electric rapid transient pulse group resistance standard. A leŋ GB/T17626.5-2008 ye kë wïc në kë de kë ye cɔl surge (impact) resistance standard.
2, independent research and development production, core sensor components original imported. 2, independent research and development production, core sensor components original imported. 2, independent research and development production, core sensor components original imported.
3. Sensor modules fãa aye tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u.
4, luɔɔi de biäk ye looi në biäk ye looi në biäk ye looi në biäk ye looi në biäk ye looi në biäk ye looi në biäk ye looi në biäk ye looi në biäk ye looi në biäk ye looi në biäk ye looi në biäk ye looi
5, masin ye luɔɔi de modular design, free combination of monitoring parameters, maintenance simple and convenient.
6.Support remote device restart, main program upgrade, battery power return.
7, tɛ̈ɛ̈m kɛ IoT big data transfer platform, a lëu bï ya tɔ̈ɔ̈u në remote control, ka tɔ̈ɔ̈u në frequency setting, ka tɔ̈ɔ̈u në data report.
8, ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan
9, tɛ̈n yenë AC 220V + DC 12V solar power supply mode luɔ̈ɔ̈i thïn, ka tɛ̈n yenë yen luɔ̈ɔ̈i thïn, ka tɛ̈n yenë yen luɔ̈ɔ̈i thïn.
10, ye data tɔ̈ɔ̈u ku lɔ̈ɔ̈m në ɣän kɔ̈k yiic, ka tɛ̈n yenë data tɔ̈ɔ̈u tɔ̈ɔ̈u tɔ̈ɔ̈u tɔ̈ɔ̈u
11, tɔ̈ɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u


Gɛɛr Installation:
1, tɛ̈n tɔ̈u. A sɔrɔ ka 50 * 50 * 50cm bɛ̈ɛ̈i, ka tɛ̈n ka tɛ̈n ka tɛ̈n ka tɛ̈n ka tɛ̈n ka tɛ̈n ka tɛ̈n ka tɛ̈n ka tɛ̈n ka tɛ̈n ka tɛ̈n ka tɛ̈n ka tɛ̈n ka tɛ̈n ka tɛ̈n ka tɛ
Kä ye kek looi ku kä ye kek looi: Spade, pi ye kek looi, beton, patch, wooden board, mid-size cross screwdriver, horizontal bar, live wrench, clamps
2, tɛ̈ɛ̈r tɔ̈u (tɛ̈ɛ̈r tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u Lɔ̈k tɛ̈n yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen
Kä ye kek looi ku kä ye kek looi: ye kek looi, ye kek looi, ye kek looi, ye kek looi, ye kek looi, ye kek looi, ye kek looi, ye kek looi, ye kek looi, ye kek looi
Installation Preparation:
1. Soil ground. It is necessary to dig a 50 * 50 * 50cm earth pit, place the embedded parts in the center, pour concrete (plane level), and the top 5cm of the embedded parts is exposed to the ground. When pouring concrete, the embedded parts thread shall be wrapped and solidified for 7-10 days, and then the equipment can be installed.
Materials and tools preparation: shovels, tap water, concrete, trowel, plank, medium cross screwdriver, horizontal ruler, live wrench, pliers.
2. Hard ground (thickness not less than 10cm). According to the position of the mounting hole of the bracket base, drill 4 round holes with diameter of 18mm and depth of 120mm on the hard ground, put in M14 expansion bolt, and then install the equipment directly.
Materials and tools preparation: punch hammer, hammer, medium cross screwdriver, level ruler, adjustable spanner, pliers
