Aeronautical Zhida Test Equipment (Dongguan City) Co., Ltd.
Kuæa>Proizvodi>Cold and hot impact test box High and low temperature impact test box Temperature cycle alternating impact box
Informacije o firmi
  • Nivo transakcije
    Član VIP
  • Kontakt
  • Telefon
    13412317138
  • Адрес
    A Building, Songyuan Innovation Science and Technology City, 126 Junda West Road, Dongguan City
Kontakt sada
Cold and hot impact test box High and low temperature impact test box Temperature cycle alternating impact box
Lɔ̈ɔ̈i de tɛ̈ɛ̈r de tɛ̈ɛ̈r de tɛ̈ɛ̈r de tɛ̈ɛ̈r de tɛ̈ɛ̈r de tɛ̈ɛ̈r de tɛ̈ɛ̈r de tɛ̈ɛ̈r de tɛ̈ɛ̈r de tɛ̈ɛ̈ A ye tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n
Detalji proizvoda


A. Parameters of cold and hot impact test box:

Product Structure Cold Heat Impact Tester

Tɛmɛ tɛmɛ -40 ~ 150, -55 ~ 150, -65 ~ 150 ℃

Parameters teknis

High greenhouse preheating temperature range ambient temperature ~ 200 ℃

Waktu kɔrɔ

≤35min (ye luui raan tök)

Low greenhouse pre-cooling temperature range ambient temperature ~-70 ℃

Waktu ye cɔl cooling ≤30min (ye luui ye raan tök)

Studio

Temperature range -40 ℃, -55 ℃, -65 ~ + 150 ℃

Temperature accuracy ≤ ± 0.5 ℃

Temp recovery time ≤5min

Low temperature test ≥30min

Tɛstɛr tɛmɛ ≥30min

Material

Outer box material cold rolled steel electrostatic spraying

Kä ye kek looi kä ye kek looi kä ye kek looi kä ye kek looi kä ye kek looi kä ye kek looi kä ye kek looi kä ye kek looi kä ye kek looi kä ye kek looi kä ye kek looi

Material insulation ultrafine glass insulation cotton

Controller de Configuration de Components Korea Sanyuan TEMI880S True Color Touch Screen Impact Box Dedicated Program Controller

Heater Stainless Steel Fin Chip Heater

Cooling System Compressor Air Cooling, Water Cooling

Fɛɛr Refrigeration

Cooling ye tɛ̈n tök, cooling ye tɛ̈n tök

Cooling media

R-404A, R-23

Circulation System

Fans stainless steel achieve air's forced circulating wind door conversion cylinder drive

Configuration wɛɛr

Testing cable lead out port Φ50mm hole 1 piece; Lower corner wheel

Studio Hollow Conductive Electric Thermal Defrost Function Glass Watching Window and Lighting

II. Specifications and technical parameters of cold and hot impact tester machine (Kä ye kek looi në masin de them)

YHZD-50 YHZD-80 YHZD-108 YHZD-150 YHZD-250

Studio size 36×35×40 50×40×40 60×40×45 60×50×50 70×60×60

Dimensions: 165 × 179 × 144 179 × 185 × 144 180 × 180 × 150 180 × 189 × 154 190 × 205 × 165

Third, Cold-Heat Impact Tester Machine ye luɔɔi:

Cold and Heat Impact Tester Machine Three box high and low temperature impact tester is used in electronics, automotive accessories, metal, chemical materials, plastic and other industries, testing various materials for high and low temperature repeated resistance.

Ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka

4. Kä ye kek looi në masini ye kek tïŋ në koom ye kek tïŋ në koom ye kek tïŋ në koom ye kek tïŋ në koom ye kek tïŋ:

1, awowa ye cɛ̈ɛ̈k, ka cɛ̈ɛ̈k, ka cɛ̈ɛ̈k, ka cɛ̈ɛ̈k, ka cɛ̈ɛ̈k, ka cɛ̈ɛ̈k, ka cɛ̈ɛ̈k.

2, cold and hot impact box divided into high temperature box, low temperature box, test box three parts, using a unique thermal insulation structure and thermal storage cooling effect, when the test needs to be measured completely static, using cold and hot wind path switching method to bring cold, hot temperature into the test zone to achieve cold and hot impact test purpose.

3, luɔ̈ɔ̈i de kä ye kek them,? Controller adopts large color LCD human machine touch dialogue LCD human machine interface controller, operation simple,? Ŋi'i yaa nana, a tɛŋ a tɛŋ a tɛŋ a tɛŋ a tɛŋ a tɛŋ a tɛŋ a tɛŋ a tɛŋ a tɛŋ. Chinese, English ye tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë t 96 test specifications independent set, impact time 999 hours 59 minutes, cycle cycle 1~999 times can be set, can achieve automatic cooling machine operation, on achieving automation, reducing the operator's work load, can automatically start, stop work operation at any time. 96 test specifications independent set, impact time 999 hours 59 minutes, cycle cycle time 1~999 times can be set, can achieve automatic cooling machine operation, on achieving automation, reducing the operator's work load, can automatically start, stop work operation at any time.

4, ye tɔ̈u në baŋ cuëc de boŋ de boŋ de boŋ de boŋ de boŋ de boŋ de boŋ de boŋ de boŋ de boŋ de boŋ de boŋ de boŋ de boŋ de boŋ de boŋ de boŋ.

5, a lëu ba tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ

6, a tɔ̈u në automatique, high system circuit, any machine part action, a tɔ̈u në PLC locking treatment, a tɔ̈u në PID automatic calculation control, a tɔ̈u në temperature control precision.

7.Advanced science air circulation cycle design to make room temperature uniform, avoiding any dead corner. 7.Advanced science air circulation cycle design to make room temperature uniform, avoiding any dead corner. 7.Advanced science air circulation cycle design to make room temperature uniform, avoiding any dead corner.

8, ye gël ye, ye gël ye, ye gël ye, ye gël ye, ye gël ye, ye gël ye, ye gël ye, ye gël ye, ye gël ye, ye gël ye, ye gël ye, ye gël ye, ye gël ye, ye gël ye, ye gël ye, ye gël ye.

9.Can set the number of cycles and removal frost times automatically (manually) 9.Can set the number of cycles and removal frost times automatically (manually) 9.Can set the number of cycles and removal frost times automatically (manually)? Ka fara yen, fiɲɛ bɛ̈n bɛ̈n bɛ̈n bɛ̈n bɛ̈n bɛ̈n bɛ̈n bɛ̈n bɛ̈n bɛ̈n bɛ̈n bɛ̈n bɛ̈n bɛ̈n bɛ̈n bɛ̈ Tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ

10, cooling system adopts a duplicate low temperature circuit system design, cooling unit adopts a European and American original import compressor, and uses a green environmental protection (HFC) refrigerant R507, R23 to zero ozone coefficient.

Protection function: Power overload protection, leakage protection, control circuit overload, short circuit protection, compressor protection, ground protection, overheating protection, alarm audio tips etc.


视频更新中。。。

Video wɛr tïŋ

Онлайн разпит
  • Kontakti
  • Kompanija
  • Telefon
  • E-mail
  • WeChat
  • Kod provjere
  • Сједност поруки

Uspješna operacija!

Uspješna operacija!

Uspješna operacija!