Rubber Voltage Breaking Tester Plastic Breaking Voltage Tester Voltage Tester 50000v
Features of performance: (1) door limit position protection: don't close the door, even if the power point experiment begins, the device doesn't respond anything, the software has: security doors don't close the tip. (1) door limit position protection: don't close the door, even if the power point experiment begins, the device doesn't respond anything, the software has: security doors don't close the tip.) (2) Voltage Zero Protection: If during the experiment, suddenly power off, after the next start, will automatically return to zero, ensuring the initial voltage is at zero (3) Termination Voltage Protection: can be terminated through software setting, ensuring that during the surge process if there is a abnormal rise to the specified voltage after, automatically terminated and returned to zero (4) High voltage mechanical limit: If the software system loses control, the voltage continues to rise, to the high voltage limit after automatically returned to zero if not stopped after breaking, through overcurrent protector collecting data to ensure that the voltage automatically returned to zero has a high voltage indicator lamp, by observing the state of the indicator lamp to judge the real rise or at zero if done a long experiment, to ensure the good operation of the equipment, the equipment has a transformer exhaust port, ensuring the good operation of the transformer. Ka tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ (5) Gɛlɛ̈ɛ̈r de piny (6) Gɛlɛ̈ɛ̈r de short circuit (7) Gɛlɛ̈ɛ̈r de software (8) Gɛlɛ̈ɛ̈r de leakage (9) Gɛlɛ̈ɛ̈r de discharge end of experiment




Main configuration: 1, host 1 set 2, discharge device 1 set 3, computer 1 set 4, printer 1 set 5, control software 1 set 6, test electrode 1 set 7, fuel tank 1 set 8, test bench 1 set 9, instructions 1 copy 10, certificate of qualification 1 copy 11, packing list 1 copy before testing ready: 1. connect power cable, data cable, grounding cable 2. check the power cable, data cable, grounding cable is well connected 3. after connecting, open the power total switch preheating for 15 minutes 4. open computer windows system, double click the voltage breaking the tester software's quick icon, enter the test operation interface.




