



Yïn, raan yam, raan kɔrɔ, yïn ye hangal gɛlɛ̈ɛ̈r ba, ye raan kɔrɔ, ye raan kɔrɔ, ye raan kɔrɔ, ye raan kɔrɔ, ye raan kɔrɔ? Kɔmpaniɛ dɛ ye masin juëc ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr yeFood, chemical, plastic powder feeding machine, raw materials are small, and noise is small, each hour delivery capacity can reach5T. Pipe diameter is 127, 133, 159, 168, 219 and other different sizes, depending on how much customer delivers per hour to order the diameter of the pipe, so the price is not the same. 5T. Pipe diameter is 127, 133, 159, 168, 219 and other different sizes, depending on how much customer delivers per hour to order the diameter of the pipe, so the price is not the same.Guangzhou Yitong Plastic MachineInjiniyer design3, High-tech welders10A tɔŋ. I can say I can do! Yïn dɛ̈t ye raan töŋ ye, dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t ye dɛ̈t! Quality kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen-kelen Welcoming to the field!
Features of feeding machine:
1, looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi looi
2.Can be used with various specifications extruder, high speed mixer, plastic mixer. 2.Can be used with various specifications extruder, high speed mixer, plastic mixer. 2.Can be used with various specifications extruder, high speed mixer, plastic mixer.
3, a bɛ luɔɔi kɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ
4, ye seri de masin ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr
5, a tɩŋa tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n t
6, kä juëc ye kek looi, kä juëc ye kek looi, kä juëc ye kek looi, kä juëc ye kek looi, kä juëc ye kek looi.
7, Mechanical automation degree high, automatic filling materials, and can set up material time. 7, mechanical automation degree high, automatic filling materials, and can set up material time. 7, mechanical automation degree high, automatic filling materials, and can set up material time.
Loading Machine Configuration and Difference (Lɔ̈ɔ̈ŋ ku Lɔ̈ɔ̈ŋ):
1, ye masin bɛɛ̈ɛ̈i bɛɛ̈i bɛ̈i bɛ̈i bɛ̈i bɛ̈i bɛ̈i bɛ̈i bɛ̈i bɛ̈i bɛ̈i bɛ̈i bɛ̈i bɛ̈i bɛ̈i bɛ A tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈
2, stainless steel feeding tube inner wall and spiral blade gap distance does not exceed 3mm, spiral blade laser cutting processing, all welding ports polishing treatment to achieve smooth non-residual materials. 2, stainless steel feeding tube inner wall and spiral blade gap distance does not exceed 3mm, spiral blade laser cutting processing, all welding ports polishing treatment to achieve smooth non-residual materials.
3, ka tɛmɛ ye 100 kg ka tɛmɛ ye 15 ton ka tɛmɛ ye.
4, ye luɔɔi de ye luɔɔi de ye luɔɔi de ye luɔɔi de ye luɔɔi de ye luɔɔi de ye luɔɔi de ye luɔɔi de ye luɔɔi de ye luɔɔi de ye luɔɔi de ye luɔɔi de ye luɔɔi de ye luɔɔi de ye luɔɔi de ye luɔɔi de ye luɔɔi de ye luɔɔ
5, science design: spiral shaft adopts stainless steel seamless tube, by lathe corrected, ensure concentricity, machine operation stable, the blades all use stainless steel materials, the blades use thickened stainless steel blades.
6, tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈ Ka tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
7, circuit design for overload protection, effective protection of motor not burning, long lasting. 7, circuit design for overload protection, effective protection of motor not burning, long lasting. 7, circuit design for overload protection, effective protection of motor not burning, long lasting. A tɛ̈n yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen Lɩk wakat kɔnɔ, tʋm-tʋm tɩ tɩ tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n.
Parameters Technical ye Loader
|
Model Specifications |
Unit |
YTZD-127 |
YTZD-133 |
YTZD-159 |
YTZD-168 |
YTZD-219 |
|
Power |
V |
380 |
380 |
380 |
380 |
380 |
|
Puwol motɛr |
KW |
1.5 |
2.2 |
2.2 |
3 |
4 |
|
Diameter tubu feeding |
MM |
127 |
133 |
159 |
168 |
219 |
|
Load amount |
KG/H |
500 |
800 |
1200 |
2000 |
3000 |
|
Capacity of box |
KG |
50 |
75 |
100 |
150 |
200 |
|
Size boxL*W*H
|
CM |
550*550*750 |
640*640*750 |
700*700*750 |
800*800*750 |
1000*1000*750 Luɔi masin: |
Luɔi masin:A tʋmɩyɛ ne plastik, elektrɔnik, mɩŋ, kemikal, otel, etc. A lëu bï ya looi tɛ̈n yenë a kɔc wɛ̈t tɔ̈u thïn wɛ̈t tɔ̈u thïn wɛ̈t tɔ̈u thïn.
Yitong Post-Sales Service:
1Installation debugging: after the equipment delivery, with our department free to take responsibility for personal guidance of equipment installation debugging. Installation debugging: after the equipment delivery, with our department free to take responsibility for personal guidance of equipment installation debugging.
2Guarantee period: our company sells the equipment, free warranty period is one year (except for perishable parts), during the warranty period, parts replacement and maintenance are provided free, but all non-normal damage to the equipment is not covered by warranty, buying house should pay the replacement parts;
3.Ka tɛmɛ warranty period: ka tɛmɛ warranty period, ka tɛmɛ warranty period, ka tɛmɛ warranty period, ka tɛmɛ warranty period, ka tɛmɛ warranty period, ka tɛmɛ warranty period, ka tɛmɛ warranty period, ka tɛmɛ warr
4.Service time commitment: during equipment use, machine failure occurs, use department should cut off the power supply, oral or written notify our department of service, our department of service will be in after receiving the notification. Service time commitment: during equipment use, machine failure occurs, use department should cut off the power supply, oral or written notify our department of service, our department of service will be in after receiving the notification.24Lɔ̈k solusyonɛn dɛ̈t kɔnɔ ku lɛ̈k kɔc ye ɣɔɔc dɛ̈t kɔnɔ;
5Kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye
