Shanghai Gaotian Pump Co., Ltd.
Kuæa>Proizvodi>XBD-HL pomp ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc
Informacije o firmi
  • Nivo transakcije
    Član VIP
  • Kontakt
  • Telefon
  • Адрес
    Shanghai Jinshan District Tinglin Town Industrial South District Linsheng Road No.178
Kontakt sada
XBD-HL pomp ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc
Product Name: XBD-HL Constant Pressure Cutting Line Pump Place of Origin: Shanghai Production Period: 3-5 days Shipping Method: Logistics Shipping, Ji
Detalji proizvoda

XBD-HL pomp ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc






A, XBD-HL constant pressure buffer multi-stage fire pump product characteristics:
1, ka tɛ̈n yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen
2, a lëu bï rot ya waar në kë cï gam.
3, luɔ̈ɔ̈i de stainless steel material, bɛ̈ɛ̈i de pump stainless die, ka jɔl ya tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ.
4, a tɛ̈n tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u tɔ̈u.

II. Kä ye looi:
1. Pii ye looi
2. Pii ye kɔnɔ
3, Cooling System
4, Ji'a jii'a jii'a jii'a jii'a jii'a jii'a jii'a jii'a jii'a jii'a jii'a jii'a jii'a
5. Pii ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r
6. Boiler water

Third, User Feedback:


4. Installation Technical Requirements:

Pumps ye tɔ̈u piny, ye tɔ̈u piny, ye tɔ̈u piny, ye tɔ̈u piny, ye tɔ̈u piny, ye tɔ̈u piny, ye tɔ̈u piny, ye tɔ̈u piny, ye tɔ̈u piny.

Ni a tɔ̈ɔ̈u piny kan wala a tɔ̈ɔ̈u piny kan, a tɛ̈n yenë a tɔ̈ɔ̈u piny kan, a tɛ̈n yenë a tɔ̈ɔ̈u piny kan, a tɛ̈n yenë a tɔ̈ɔ̈u piny kan.

Pump ye lɔ̈ɔ̈m ku lɔ̈ɔ̈m pip de pip de pip de pip de pip de pip de pip de pip de pip de pip de pip de pip de pip de pip de pip de pip de pip de pip de pip de pip de pip de pip de pip de pip de pip

1, pump unit horizontally placed, at the base below ground foot bolt hole with metal pad pad pad flat, screw on the nut, fill the cement, set the base stable, install to prevent the base three points contact unstable. 1, pump unit horizontally placed, at the base below ground foot bolt hole with metal pad block pad flat, screw on the nut, fill the cement, set the base stable, install to prevent the base three points contact unstable.

2, connect motor power, motor turn should make the pump press the rack arrow to rotate (from the motor end of the pump, the rotation is in the direction of the clock needle) 2, connect motor power, motor turn should make the pump press the rack arrow to rotate (from the motor end of the pump, the rotation is in the direction of the clock needle)

3, pump import and export to tap water, pipe diameter should be the same as pump import diameter, import and export pipeline should be very good to neutral, length suitable, can't make the pump subject to large external force.

4, yïn adhil ba tɛ̈n tɔ̈ɔ̈u ka tɛ̈n tɔ̈ɔ̈u ka tɛ̈n tɔ̈ɔ̈u:

a Rotate motor shaft with hand, rotation should be flexible, no card blocking phenomenon. a Rotate motor shaft with hand, rotation should be flexible, no card blocking phenomenon. a Rotate motor shaft with hand, rotation should be flexible, no card blocking phenomenon. a Rotate motor shaft with hand, rotation should be flexible, no card blocking phenomenon.

b Ka tɛ̈n bɛ̈ɛ̈r bɛ̈ɛ̈r bɛ̈ɛ̈r bɛ̈ɛ̈r bɛ̈ɛ̈r bɛ̈ɛ̈r

C ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic


5. Lɔ̈k kɛ̈l:

Failure phenomena

Sabab dɔ

Metode de exclusion

Pump ka lëu bɛ̈n

1No start condition (cït mɛn power connection, etc.)

2, Wheel caam

3Motor dɔ̈ɔ̈r

4Pump's frozen. Pump's frozen.

1 Tïŋ ba kë ye looi ya gam

2 Repair, waar

3. Kuen, Repair

4. Lɔ̈k ba pomp ye kɔ̈k ye kɔ̈k ye kɔ̈k ye kɔ̈k ye kɔ̈k ye kɔ̈k ye kɔ̈k ye kɔ̈k

No pump out of water

1Steam corrosion

2Inhalation tube section leakage gas inhalation, exhaust valve shutdown

3.Inhalation tube blockage

4.Rotational direction reversed (Rotational direction reversed)

1、Guarantee import pressure

2、Change open inhalation, discharge valve

3、 Remove and remove alien objects. Yïn ye awowa bɛ̈ɛ̈i dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r

4、Lɔ̈ɔ̈m motɛr dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r

Ka tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n

1Air inhale

2、 awowa kɔ̈k tɔ̈ɔ̈u rɛy wheel

3, wheel ku shell gap juak

4、 Output pipe flow blockage ye dɔŋ

1Check the inhalation tube segment and replace (Lɛ̈k tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n)

2Remove and clear alien objects (Yïn bɛ̈ɛ̈r bɛ̈ɛ̈r bɛ̈ɛ̈r bɛ̈ɛ̈r bɛ̈ɛ

3.Gɛɛr wala wal

4Ka tubu dɔɔni dɔɔni dɔɔni dɔɔni dɔɔni dɔɔni dɔɔni dɔɔni dɔɔni dɔɔni dɔɔni dɔɔni dɔɔni dɔɔni dɔɔni

Pump leakage (Pump leakage)

1、Mechanical sealing damage

2ORing damage

1、 Gɛɛr kä yam

Pump Vibration

1Pump steam corrosion

2Pump ka tiit

3Pump shaft wala bearing ye cɔk

4、 Wheel ye tɔ̈ɔ̈u wala ye tɔ̈ɔ̈u

5、 Traffic ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni

1、Check if imported leakage and pressure. Check if imported leakage and pressure. Check if imported leakage and pressure. Check if imported leakage and pressure.

2、Ka tɛmɛ ka pomp tiit

3、 Gɛɛr

4、Delete check or replace

5、 Ajuiɛɛr (tɔ̈ɔ̈u) valve



6. Parameter model:





Онлайн разпит
  • Kontakti
  • Kompanija
  • Telefon
  • E-mail
  • WeChat
  • Kod provjere
  • Сједност поруки

Uspješna operacija!

Uspješna operacija!

Uspješna operacija!